3/27/2024 | 4412330000 | BIRCH PLYWOOD SAMPLES (SENT FREE OF CHARGE FOR TESTING), CONSISTING EXCLUSIVELY OF BIRCH VENEER SHEETS, 1.15-2.00 MM THICK, INCLUDING BOTH OUTER LAYERS. EDGES SAWN ON FOUR SIDES. MADE IN ACCORDANCE WITH TECHNICAL SPECIFICATIONS | XXXXXXXXXX | 1 | М3 | 0 | Turkey | NA |
3/25/2024 | 2909440000 | SAMPLES AND SAMPLES FOR RESEARCH AND TESTING: ETHYL CELLULOSOLV (PREMIUM TECHNICAL QUALITY), MASS FRACTION OF ETHYL CELLULOSE SOLUTION - 99.9%. | XXXXXXXXXX | 1 | N/A | 0 | Turkey | NA |
3/20/2024 | 8704239209 | COMPLETE CIVILIAN PURPOSES TRUCK WITH DRIVER'S INSTRUMENT, SPARE PARTS-50 PCS, TECHNICAL DOCK-50 PCS, FLATBED TRUCK WITH AWNING-FRAME, BENCHES, MODEL: 4311K0, NEW, 2024, 50 PCS, DIESEL ENGINE-740.30, ENGINE POWER-245 HP (180 kW), ENGINE CAPACITY-10,857 CM | XXXXXXXXXX | 1 | ШТ | 2255997.15 | Turkey | SAMSUNSUN Türkiye |
3/19/2024 | 9031803800 | THE COMMISSIONING MEASUREMENT SYSTEM (CMS) FOR THE AKKUYU NPP IS INTENDED FOR TESTING IN DESIGN OPERATING MODES OF THE REACTOR PLANT (RP) SYSTEMS AND THE MAIN PROCESS EQUIPMENT DURING COMMISSIONING (DURING CIRCULATION WASHING AND | XXXXXXXXXX | 1 | ШТ | 7003129.52 | Turkey | AKKUYU NUCLEAR POWER PLANT CONSTRUCTION SITE |
3/15/2024 | 9030840009 | RETOM-51 (M2) 2020 MEASURING SOFTWARE AND HARDWARE COMPLEX WITH TECHNICAL DOCUMENTATION AND A SET OF SPARE AND INSTALLATION PARTS FOR TESTING ELECTRICAL EQUIPMENT FOR POWER UNITS No. 1, 2, 3, 4 AND | XXXXXXXXXX | 1 | ШТ | 0 | Turkey | NA |
3/13/2024 | 4819200000 | CARDBOARD CUTTING OF TEA PACKAGING - CARDBOARD BOX BLANKS FROM THE CUTTING THAT ARE SUBSEQUENTLY ASSEMBLED INTO A BOX IN WHICH THE TEA BAGS WILL BE PACKED, MADE OF NON-CORRUGATED CARDBOARD. REMOVAL OF SAMPLES FOR TESTING AND TESTING IN PRODUCTION | XXXXXXXXXX | 1 | N/A | 0 | Turkey | ISTANBUL |
2/27/2024 | 7309005100 | EQUIPMENT FOR INSTALLATION AND OPERATION AT POWER UNITS №№ 3, 4, NUCLEAR POWER PLANT IN THE QUANTITY OF 2 TANKS WITH A VOLUME OF 667 M3 (667,000 L), NOT ADAPTED FOR TESTING EXPLOSIVES OR EXPLOSIVE DEVICES OR WORKING WITH NUCLEAR FUEL, IS SUPPLIED | XXXXXXXXXX | 0 | N/A | 1452532.29 | Turkey | KRASNODAR |
2/27/2024 | 7309005100 | EQUIPMENT FOR INSTALLATION AND OPERATION AT POWER UNITS No. 3, 4, AKKUYU NPP IN THE QUANTITY OF 2 TANKS WITH A VOLUME OF 1010 M3 (1,010,000 L), ARE NOT ADAPTED FOR TESTING EXPLOSIVES OR EXPLOSIVE DEVICES OR WORKING WITH NUCLEAR FUEL, | XXXXXXXXXX | 0 | N/A | 2877254.65 | Turkey | KRASNODAR |
2/22/2024 | 7603100000 | ALUMINUM POWDER OF NON-LAYERED STRUCTURE OF GRADE APZh IN A PLASTIC WIDE-NECK JAR. FREE SAMPLES FOR TESTING AT A PLANT FOR THE PRODUCTION OF CIVIL EXPLOSIVES FOR TUNNEL CONSTRUCTION. | XXXXXXXXXX | 0 | N/A | 0 | Turkey | NA |
2/22/2024 | 3920108909 | POLYOLEFIN PACKAGING FILM, SUPPLIED AS MATERIALS FOR EQUIPMENT TESTING. THE GOODS ARE NOT SUBJECT TO PAYMENT. | XXXXXXXXXX | 0 | N/A | 0 | Turkey | SAKARYA |