| 3/29/2024 | 4407123201 | TIMBER (SAWN TIMBER (BOARDS)) EDGED SPRUCE, DRY, MOISTURE 10-20% (PICEA ABIES KARST), CUT LONGITUDINALLY, PROCESSED BY PLANING, UNHEAVY, NOT SANDED, NO TENSION JOINTS. MEASUREMENT TECHNIQUE M 13-24-13, FR.1.27.2014.17136. LIMIT. CUT-OFF ACCORDING TO GOST | XXXXXXXXXX | 2 | М3 | 546486.51 | Turkey | PETROZAVODSK |
| 3/29/2024 | 7304499309 | CORROSION-RESISTANT STEEL CIRCULAR PIPES WITH AN OUTER DIAMETER OF NOT MORE THAN 168.3 MM: PARTIAL SUPPLY OF AUXILIARY LINES OF THE VD REGENERATION PIPELINES AND THE HEATING STEAM SYSTEM SPP (DRAINAGES, AIR VENTS, LEVEL GAUGES PIPING, ETC.) | XXXXXXXXXX | 1 | N/A | 150609.19 | Turkey | REPUBLIC OF TURKEY AKKUYU NUCLEAR POWER PLANT |
| 3/29/2024 | 4407113401 | TIMBER (SAWN TIMBER (BOARDS)) EDGED PINE, DRY, MOISTURE 10-20% (PINUS SYLVESTRIS L.), CUT LONGITUDINALLY, PROCESSED BY PLANING, UNHEAVY, NOT SANDED, NO TENSION JOINTS. MEASUREMENT TECHNIQUE M 13-24-13 FR.1.27.2 014.17136. LIMIT. CLEARANCE ACCORDING TO GOS | XXXXXXXXXX | 2 | М3 | 107322.13 | Turkey | PETROZAVODSK |
| 3/28/2024 | 4407123201 | TIMBER (SAWN TIMBER (BOARDS)) EDGED SPRUCE, DRY, MOISTURE 10-20% (PICEA ABIES KARST), CUT LONGITUDINALLY, PROCESSED BY PLANING, UNHEAVY, NOT SANDED, NO TENSION JOINTS. MEASUREMENT TECHNIQUE M 13-24-13, FR.1.27.2014.17136. LIMIT. CUT-OFF ACCORDING TO GOST | XXXXXXXXXX | 2 | М3 | 486014.66 | Turkey | PETROZAVODSK |
| 3/28/2024 | 4407113401 | TIMBER (SAWN TIMBER (BOARDS)) EDGED PINE, DRY, MOISTURE 10-20% (PINUS SYLVESTRIS L.), SAWN LONGITUDINALLY, PROCESSED BY PLANING, UNHEAVY, NOT SANDED, NO TENSION JOINTS. MEASUREMENT TECHNIQUE M 13-24-13 FR.1.27.2 014.17136. LIMIT. CLEARANCE ACCORDING TO GO | XXXXXXXXXX | 2 | М3 | 95446.76 | Turkey | PETROZAVODSK |
| 3/22/2024 | 7309005900 | 1. LEVEL DETERMINATION TANKS KHSK 283.00.000 - 8 PCS. ARE DESIGNED TO DETERMINE THE LEVEL OF SEA WATER IN THE WATER CHAMBERS OF THE MAIN CONDENSER. THE TANKS ARE A PART OF THE CONDENSER SYSTEM OF THE TURBINE OF THE UMA (MAG) BUILDING, THE TANKS ARE A VERT | XXXXXXXXXX | 1 | N/A | 380040.27 | Turkey | OZERSK |
| 3/22/2024 | 8537109800 | THE UPPER LEVEL OF THE AUTOMATED RADIATION MONITORING SYSTEM (AU RA) FOR POWER UNIT #1 OF THE AKKUYU NPP - 1 SET, THE AU RA IS DESIGNED TO ENSURE THE COLLECTION, PROCESSING, ARCHIVING, STORAGE AND PRESENTATION OF INFORMATION ON THE PARAMETERS, | XXXXXXXXXX | 1 | N/A | 1115118.34 | Turkey | AKKUYU NUCLEAR POWER PLANT CONSTRUCTION SITE |
| 3/19/2024 | 9031803800 | THE COMMISSIONING MEASUREMENT SYSTEM (CMS) FOR THE AKKUYU NPP IS INTENDED FOR TESTING IN DESIGN OPERATING MODES OF THE REACTOR PLANT (RP) SYSTEMS AND THE MAIN PROCESS EQUIPMENT DURING COMMISSIONING (DURING CIRCULATION WASHING AND | XXXXXXXXXX | 1 | ШТ | 7003129.52 | Turkey | AKKUYU NUCLEAR POWER PLANT CONSTRUCTION SITE |
| 3/19/2024 | 9029900009 | I181-1 TACHOMETER INDICATOR WITH MEASUREMENT LIMIT OF 400-0-400, IS PART OF THE K18 REMOTE TACHOMETER INDICATOR. INTENDED FOR TECHNICAL MEASUREMENTS AND CONTROL OF THE ROTATION SPEED OF THE MAIN ENGINES OF THE OMSKIY-134 M/X, INSTEAD OF | XXXXXXXXXX | 1 | N/A | 0 | Turkey | NIZHNY NOVGOROD CITY |
| 3/18/2024 | 7304399209 | OTHER PIPES, WITH AN OUTER DIAMETER NOT MORE THAN 168.3 MM: PARTIAL SUPPLY OF AUXILIARY LINES OF THE MAIN CONDENSATE LCA PIPELINES (DRAINAGES, AIR VENTS, EMPTYING, LEVEL GAUGES PIPING, ETC.), PART OF A SET, POWER UNIT #1, CONSISTING OF: | XXXXXXXXXX | 2 | N/A | 139891.29 | Turkey | REPUBLIC OF TURKEY AKKUYU NUCLEAR POWER PLANT |