3/25/2024 | 8536209007 | ELECTRICAL EQUIPMENT FOR SWITCHING OR PROTECTING ELECTRICAL CIRCUITS OR FOR CONNECTIONS TO ELECTRICAL CIRCUITS: AUTOMATIC CIRCUIT BREAKER АВ-8А-1 500А - 10 PCS, AUTOMATIC CIRCUIT BREAKER IS INTENDED FOR CONDUCTING CURRENT IN NORMAL MODE AND FROM | XXXXXXXXXX | 4 | N/A | 4593.53 | Turkey | ISTANBUL |
3/25/2024 | 4901100000 | TECHNICAL DOCUMENTATION: REPORT "EMISSIONS OF RADIOACTIVE SUBSTANCES FROM THE REACTOR BUILDING OF POWER UNIT #2 AND RADIATION DOSES OF THE POPULATION TAKING INTO ACCOUNT THE CURRENT PARAMETERS OF THE AKKUYU NPP SITE", IN UNBOOKED FORM: 49 SHEETS IN RUSSIA | XXXXXXXXXX | 2 | N/A | 997.26 | Turkey | ANKARA |
3/25/2024 | 4901990000 | TECHNICAL DOCUMENTATION: REPORT "ANALYSIS OF RADIOLOGICAL CONSEQUENCES OF DESIGN-BASED AND BEYOND-DESIGN-BASED ACCIDENTS OF POWER UNIT #2 OF THE AKKUYU NPP" TAKING INTO ACCOUNT THE CURRENT PARAMETERS OF THE AKKUYU NPP SITE", IN THE FORM OF ONE BROCHURE IN | XXXXXXXXXX | 2 | N/A | 4111702.98 | Turkey | ANKARA |
3/25/2024 | 8523495900 | COMPACT DISC CONTAINING THE REPORT "RADIOACTIVE SUBSTANCE EMISSIONS FROM THE REACTOR BUILDING OF POWER UNIT #2 AND POPULATION EXPOSURE DOSES TAKING INTO ACCOUNT THE CURRENT PARAMETERS OF THE AKKUYU NUCLEAR POWER PLANT SITE", TOTAL INFORMATION IN RUSSIAN A | XXXXXXXXXX | 2 | ШТ | 997.26 | Turkey | ANKARA |
3/25/2024 | 4901990000 | TECHNICAL DOCUMENTATION: REPORT "RADIOACTIVE SUBSTANCE EMISSIONS FROM THE REACTOR BUILDING OF POWER UNIT #2 AND RADIATION DOSES OF THE POPULATION TAKING INTO ACCOUNT THE CURRENT PARAMETERS OF THE AKKUYU NPP SITE", IN THE FORM OF ONE BROCHURE IN RUSSIAN AN | XXXXXXXXXX | 2 | N/A | 1618552.98 | Turkey | ANKARA |
3/25/2024 | 4901100000 | TECHNICAL DOCUMENTATION: REPORT "ANALYSIS OF RADIOLOGICAL CONSEQUENCES IN DESIGN-BASED AND BEYOND-DESIGN-BASED ACCIDENTS AT POWER UNIT #2 OF THE AKKUYU NPP" TAKING INTO ACCOUNT THE CURRENT PARAMETERS OF THE AKKUYU NPP SITE", IN UNBOOKED FORM: 382 SHEETS I | XXXXXXXXXX | 2 | N/A | 997.26 | Turkey | ANKARA |
3/25/2024 | 8523495900 | COMPACT DISC CONTAINING THE REPORT "ANALYSIS OF RADIOLOGICAL CONSEQUENCES IN DESIGN AND BEYOND DESIGN ACCIDENTS OF POWER UNIT #2 OF THE AKKUYU NUCLEAR POWER PLANT" TAKING INTO ACCOUNT THE CURRENT PARAMETERS OF THE AKKUYU NUCLEAR POWER PLANT SITE, TOTAL IN | XXXXXXXXXX | 2 | ШТ | 997.26 | Turkey | ANKARA |
3/20/2024 | 8536508008 | SWITCHES - SPEED CONTROLLERS ARE USED IN VENTILATION AND AIR CONDITIONING SYSTEMS FOR SWITCHING ON, OFF AND REGULATION OF THE ROTATION SPEED OF SINGLE-PHASE ELECTRIC MOTORS OF FANS, SPEED CONTROLLER INTERNAL MOUNTING, MAXIMUM CURRENT | XXXXXXXXXX | 13 | N/A | 866.3 | Turkey | ISTANBUL |
3/19/2024 | 8413910008 | PARTS OF SUBMERSIBLE PUMPING UNITS. ARE DESIGNED TO SUPPLY FORMATION FLUID TO THE PUMP AND ITS OPERATION TO PUMP FORMATION FLUID FROM WELLS. FLOW METER AVAILABLE - NO. APPLICATION AREA OIL INDUSTRY. | XXXXXXXXXX | 5 | N/A | 5419708.2 | Turkey | PERM |
3/18/2024 | 8536419000 | RELAYS FOR VOLTAGE NOT MORE THAN 60 V, FOR CURRENT MORE THAN 2 A, NOT SCRAP ELECTRICAL EQUIPMENT, NEW, FOR REPAIR AND MAINTENANCE OF PASSENGER VEHICLES: | XXXXXXXXXX | 23 | N/A | 2587.89 | Turkey | ISTANBUL |