3/12/2024 | 7308909809 | OTHER FERROUS METAL STRUCTURES: EMBEDDED PARTS ARE PART OF PIPELINE PENETRATIONS DESIGNED TO PASS A SINGLE PIPE OR A BUNDLE OF PIPE THROUGH THE HERMETIC ENCLOSING OF THE ACCIDENT CONTAINMENT ZONE OF A REACTOR PLANT AT A NUCLEAR POWER PLANT. EMBEDDED PARTS | XXXXXXXXXX | 1 | N/A | 183335.36 | Turkey | VOLGODONSK |
3/7/2024 | 7308909809 | COMPONENTS OF SINGLE-WALL PIPELINE SYSTEMS - PASSIVE ELEMENTS OF NUCLEAR POWER PLANT SYSTEMS, WHICH INCLUDE STEEL PIPELINE FASTENING ELEMENTS AS THE MAIN COMPONENT. PURPOSE: SUPPORT STRUCTURES OF SYSTEMS. MOVEMENT OF PROPERTY ( | XXXXXXXXXX | 3 | N/A | 0 | Bangladesh | NA |
1/15/2024 | 7308909809 | COMPONENTS OF SINGLE-WALL PIPELINE SYSTEMS - PASSIVE ELEMENTS OF NUCLEAR POWER PLANT SYSTEMS, WHICH INCLUDE STEEL PIPELINE FASTENING ELEMENTS AS THE MAIN COMPONENT. PURPOSE: SUPPORT STRUCTURES OF THE FEEDWATER SYSTEM (LAR). | XXXXXXXXXX | 2 | N/A | 119653.08 | China | ZABAYKALSKMANCHURIA |
1/10/2024 | 7308909809 | COMPONENTS OF SINGLE-WALL PIPELINE SYSTEMS - PASSIVE ELEMENTS OF NUCLEAR POWER PLANT SYSTEMS, WHICH INCLUDE STEEL PIPELINE FASTENING ELEMENTS AS THE MAIN COMPONENT. PURPOSE: SUPPORT STRUCTURES OF STEAM PURGING AND DRAINAGE SYSTEMS | XXXXXXXXXX | 2 | N/A | 419140.21 | China | ZABAYKALSKMANCHURIA |
1/10/2024 | 7308909809 | COMPONENTS OF SINGLE-WALL PIPELINE SYSTEMS - PASSIVE ELEMENTS OF NUCLEAR POWER PLANT SYSTEMS, WHICH INCLUDE STEEL PIPELINE FASTENING ELEMENTS AS THE MAIN COMPONENT. PURPOSE: SUPPORT STRUCTURES OF THE CHEMICAL STEAM WASHING SYSTEM | XXXXXXXXXX | 2 | N/A | 88913.36 | China | ZABAYKALSKMANCHURIA |
12/11/2023 | 7308909809 | THE DRIVE STATION IS INSTALLED AT THE HEAD OF THE CONVEYOR. FROM IT THE TRANSPORTED MATERIAL IS DISCHARGED FURTHER THROUGH THE TECHNOLOGICAL CHAIN (ANOTHER CONV | XXXXXXXXXX | 0 | 0 | 10852.25 | Uzbekistan | ALMALYK |
12/8/2023 | 7308909809 | THE DRIVE STATION IS INSTALLED AT THE HEAD OF THE CONVEYOR. FROM IT THE TRANSPORTED MATERIAL IS DISCHARGED FURTHER THROUGH THE TECHNOLOGICAL CHAIN (ANOTHER CONV | XXXXXXXXXX | 0 | 0 | 1904.43 | Uzbekistan | ALMALYK |
12/8/2023 | 7308909809 | THE DRIVE STATION IS INSTALLED AT THE HEAD OF THE CONVEYOR. FROM IT THE TRANSPORTED MATERIAL IS DISCHARGED FURTHER THROUGH THE TECHNOLOGICAL CHAIN (ANOTHER CONV | XXXXXXXXXX | 0 | 0 | 2651.98 | Uzbekistan | ALMALYK |
12/8/2023 | 7308909809 | A DISCHARGING STATION IS INSTALLED AT THE HEAD OF THE CONVEYOR, FROM IT THE TRANSPORTED MATERIAL IS DISCHARGED FURTHER THROUGH THE TECHNOLOGICAL CHAIN (OTHER TO | XXXXXXXXXX | 0 | 0 | 74542.44 | Uzbekistan | ALMALYK |
12/8/2023 | 7308909809 | THE DRIVE STATION IS INSTALLED AT THE HEAD OF THE CONVEYOR, FROM IT THE TRANSPORTED MATERIAL IS DISCHARGED FURTHER THROUGH THE TECHNOLOGICAL CHAIN (OTHER CONV | XXXXXXXXXX | 0 | 0 | 1904.43 | Uzbekistan | ALMALYK |