3/25/2024 | 9031908500 | CALIBRATION SAMPLES ARE NOT ELEMENTS OF THE NUCLEAR POWER PLANT. THERE ARE NO QUALITY CONTROL TECHNOLOGIES RELATED TO THE REACTOR COMPARTMENT EQUIPMENT. FOR UNITS 3 AND 4 OF THE XUDAPU NUCLEAR POWER PLANT. | XXXXXXXXXX | 1 | N/A | 86890.98 | China | MANCHURIA |
3/12/2024 | 9031908500 | A SET OF SAMPLES OF THE ELBOW OF THE MAIN CIRCULATION PIPELINE, CONSISTS OF A SAMPLE OF THE ELBOW OF THE MAIN CIRCULATION PIPELINE AM217.06.00.301. IS NOT A PART OF THE NUCLEAR POWER PLANT. PURPOSE: IS INTENDED FOR CALIBRATION OF EQUIPMENT DURING CONTROL | XXXXXXXXXX | 1 | N/A | 358984.29 | China | MANCHURIA |
1/23/2024 | 9031908500 | CALIBRATION SAMPLES. NOT ELEMENTS OF NUCLEAR POWER PLANT. FOR THE CONSTRUCTION OF POWER UNITS #7 AND #8 OF TIANWAN NUCLEAR POWER PLANT, CHINA. | XXXXXXXXXX | 2 | N/A | 135299.67 | China | SAINT PETERSBURG |
10/5/2023 | 9031908500 | SET OF WELD SAMPLES OF THE MAIN CIRCULATION PIPELINE CONSISTS OF CALIBRATION SAMPLES FOR THE FILLET WELD OF THE MAIN CIRCULATION PIPE | XXXXXXXXXX | 0 | 0 | 255250 | China | MANCHURIA |
9/5/2023 | 9031908500 | SAMPLES OF PRODUCTS INTENDED FOR CALIBRATION (VERIFICATION), ADJUSTMENT AND DETERMINATION OF PARAMETERS OF EQUIPMENT AND MATERIALS. ARE NOT ELEMENTS OF NPP, BEFORE | XXXXXXXXXX | 0 | 0 | 247260 | China | ZABAIKALSKMANCHURIA |