3/29/2024 | 7326909807 | PRODUCTS MADE OF BLACK STEEL (STEEL), MADE BY MECHANICAL PROCESSING AND ASSEMBLY - ADAPTERS ARE ASSEMBLED PRODUCTS CONSISTING OF (EACH) A HOUSING, INSERT, BEARING UNIT AND SUPPORT RING. BUSHING COMPONENTS ARE MAINLY MADE OF | XXXXXXXXXX | 1 | N/A | 3001.98 | India | MUMBAI |
3/28/2024 | 8401400000 | MAIN CIRCULATING PIPELINES AM110.06.00.000TU FOR THE CONSTRUCTION OF POWER UNIT #5 OF THE KUDANKULAM NUCLEAR POWER PLANT, INDIA. | XXXXXXXXXX | 1 | N/A | 18083872.62 | India | SAINT PETERSBURG |
3/28/2024 | 2710198200 | OPERATING SUPPLIES (BUNKERING): COMPRESSOR OIL GAZPROMNEFT COMPRESSOR F SYNTH-46 IS INTENDED FOR LUBRICATION OF PLATE, SCREW AIR COMPRESSORS, OBTAINED FROM BITUMINOUS ROCKS, ON A MINERAL BASIS, MINERAL CONTENT | XXXXXXXXXX | 2 | N/A | 50939.04 | India | USTLUGA |
3/27/2024 | 8479907000 | EQUIPMENT COMPLEX FOR A GRINDING UNIT. DESIGNED FOR FRAGMENTATION OF METAL WASTE (PIPES, ROLLED METAL), VENTILATION FILTERS, SMALL EQUIPMENT AND WASTE FROM OTHER MATERIALS WITH A DOSE RATE OF UP TO 1 MZV/H, IN ORDER TO REDUCE THEIR VOLUMES, BY | XXXXXXXXXX | 2 | N/A | 661873.47 | India | SAINT PETERSBURG |
3/26/2024 | 8481809907 | OTHER FITTINGS - PRIMARY CONVERTER STAND. WILL BE USED FOR INSTALLING PRESSURE SENSORS FOR COOLING WATER PUMPING STATION AND INSTALLED AT THE NPP IN UNIT 10URS (BLOCK PUMPING STATION), AND CANNOT BE INSTALLED IN THE FIRST | XXXXXXXXXX | 1 | N/A | 7000765.2 | India | RYBINSK |
3/26/2024 | 8481809907 | OTHER FITTINGS, OTHER, OTHER: ELECTROMAGNETIC VALVE IS INTENDED FOR OPENING AND CLOSING HOT AIR SUPPLY PIPELINES OF AIR CONDITIONING SYSTEMS OF FACILITIES. ART: 5428 -4 PCS. | XXXXXXXXXX | 2 | N/A | 0 | India | NEW DELHI |
3/26/2024 | 8413708900 | THE PUMP AS PART OF THE UNIT 45/180-K-251.1, IN ACCORDANCE WITH THE TECHNICAL REQUIREMENTS TZ N13.02.00.000, IS MADE MULTI-STAGE, HORIZONTAL WITH AN ENGINE MOUNTED ON A COMMON FRAME, NOT HERMETIC, THE GRADE OF THE FLOW PART MATERIAL IS (12X18N10T OR 08X18 | XXXXXXXXXX | 1 | ШТ | 302321.67 | India | SAINT PETERSBURG |
3/26/2024 | 9013900000 | COMPONENTS OF THE INFORMATION UNIT 9C516 AL3.975.005. ACCORDING TO THE PRINCIPLE OF OPERATION, THE INFORMATION UNIT IS A PROJECTION SYSTEM INTENDED FOR THE FORMATION OF AN INFORMATION FIELD IN SPACE. AS A SOURCE OF RADIATION | XXXXXXXXXX | 1 | N/A | 1176121.5 | India | DELHI AIRPORT |
3/26/2024 | 8481809907 | OTHER FITTINGS - PRIMARY CONVERTER STAND. WILL BE USED FOR INSTALLING PRESSURE SENSORS FOR COOLING WATER PUMPING STATION AND INSTALLED AT THE NPP IN UNIT 10URS (BLOCK PUMPING STATION), AND CANNOT BE INSTALLED IN THE FIRST | XXXXXXXXXX | 1 | N/A | 7000765.2 | India | RYBINSK |
3/26/2024 | 7308909809 | INSULATION OF THE UPPER UNIT THERMAL (32.16.092.07-0 TU). FOR THE CONSTRUCTION OF POWER UNIT #5 OF THE KUDANKULAM NUCLEAR POWER PLANT, INDIA. | XXXXXXXXXX | 1 | N/A | 464234.08 | India | SAINT PETERSBURG |