3/31/2024 | 7304410008 | OTHER PIPES, CIRCULAR CROSS-SECTION MADE OF CORROSION-RESISTANT STEEL. PARTIALLY DISASSEMBLED FOR CONVENIENCE OF TRANSPORTATION. COMPLETE WITH DOCUMENTATION. APPLICATION AREA: NUCLEAR POWER. SUPPLIED FOR THE CONSTRUCTION OF THE AKKUYU NUCLEAR POWER PLANT. | XXXXXXXXXX | 1 | N/A | 153760.74 | Turkey | ROCKET |
3/31/2024 | 7307239000 | OTHER FITTINGS FOR BUTT WELDING MADE OF CORROSION-RESISTANT STEEL. APPLICATION: NUCLEAR POWER. SUPPLIED FOR THE CONSTRUCTION OF THE AKKUYU NUCLEAR POWER PLANT. COMPLETE WITH TECHNICAL DOCUMENTATION. | XXXXXXXXXX | 2 | N/A | 274.73 | Turkey | ROCKET |
3/31/2024 | 7304499509 | OTHER PIPES, CIRCULAR CROSS-SECTION MADE OF CORROSION-RESISTANT STEEL. PARTIALLY DISASSEMBLED FOR CONVENIENCE OF TRANSPORTATION. COMPLETE WITH DOCUMENTATION. APPLICATION AREA: NUCLEAR POWER. SUPPLIED FOR THE CONSTRUCTION OF THE AKKUYU NUCLEAR POWER PLANT. | XXXXXXXXXX | 1 | N/A | 11559.73 | Turkey | ROCKET |
3/31/2024 | 8426490091 | PIPE-LAYER TEMPORARILY BRINGED IN FOR CONSTRUCTION WORKS ON THE EXTERNAL TRANSPORT GAS PIPELINE OF THE HARAMUR LOCATION: | XXXXXXXXXX | 1 | ШТ | 0 | Turkey | ADANA |
3/31/2024 | 7304410008 | OTHER PIPES, CIRCULAR CROSS-SECTION MADE OF CORROSION-RESISTANT STEEL. PARTIALLY DISASSEMBLED FOR CONVENIENCE OF TRANSPORTATION. COMPLETE WITH DOCUMENTATION. APPLICATION AREA: NUCLEAR POWER. SUPPLIED FOR THE CONSTRUCTION OF THE AKKUYU NUCLEAR POWER PLANT. | XXXXXXXXXX | 2 | N/A | 127476.87 | Turkey | ROCKET |
3/31/2024 | 7304499309 | OTHER PIPES, ROUND CROSS-SECTION MADE OF CORROSION-RESISTANT STEEL. PARTIALLY DISASSEMBLED FOR CONVENIENCE OF TRANSPORTATION. COMPLETE WITH DOCUMENTATION. APPLICATION AREA: NUCLEAR POWER. SUPPLIED FOR THE CONSTRUCTION OF THE AKKUYU NUCLEAR POWER PLANT. | XXXXXXXXXX | 3 | N/A | 643.71 | Turkey | ROCKET |
3/30/2024 | 8502132000 | ELECTRIC GENERATOR SETS WITH A COMPRESSION IGNITION PISTON INTERNAL COMBUSTION ENGINE WITH A RATED OUTPUT POWER OF MORE THAN 375 KVA BUT NOT MORE THAN 750 KVA, TEMPORARILY IMPORTED FOR CONSTRUCTION WORKS ON AN EXTERNAL GAS PIPELINE | XXXXXXXXXX | 2 | ШТ | 0 | Turkey | ADANA |
3/30/2024 | 7307931100 | BUTT WELDING FITTINGS: CARBON NON-CORROSION STEEL ELBOW - COMPONENTS OF PROCESS PIPELINE OVERHEAD (00USY) AKU.0120.00USY.0.TM.TB0005, APPLICATION: NUCLEAR POWER. SUPPLIED FOR THE CONSTRUCTION OF THE AKKUYU NUCLEAR POWER PLANT. MAINLY | XXXXXXXXXX | 3 | N/A | 7091.85 | Turkey | NIZHNY NOVGOROD RUSSIA |
3/30/2024 | 8414802200 | POSITIVE RECIPROCATING COMPRESSORS WITH AN EXCESS WORKING PRESSURE OF NOT MORE THAN 15 BAR, WITH A CAPACITY OF NOT MORE THAN 60 M3/H, TEMPORARILY IMPORTED FOR CONSTRUCTION WORKS ON THE EXTERNAL TRANSPORT GAS PIPELINE OF THE HARAMUR LOCATION: | XXXXXXXXXX | 3 | ШТ | 0 | Turkey | ADANA |
3/30/2024 | 8426490091 | PIPE-LAYER TEMPORARILY IMPORTED FOR CONSTRUCTION WORKS ON THE EXTERNAL TRANSPORT GAS PIPELINE OF THE HARAMUR LOCATION: | XXXXXXXXXX | 2 | ШТ | 0 | Turkey | ADANA |