3/22/2016 | 84831099 | (SPARE PARTS FOR OIL FIELD) DRIVE SHAFT2211V2FUF4 L=415 (NET WT. 43.00 KGS) | 1 | PCS | 361.47 | China | Kolkata Sea | SITARAM ENERGY AND LOGISTICS LIMITED | Get Detailed Shipment Records
|
3/8/2016 | 84834000 | PRIMARY GEAR BOX FOR STEEL MELTING SHOP PLANT (DTLS AS PER INV & P.LIST) | 1 | NOS | 47024.25 | China | Kolkata Sea | ELECTROSTEEL STEELS LIMITED |
3/18/2016 | 84836090 | SOFT COUPLING OF AIR BLOWER 3L62WDA SRU - 1 SET --OTHER COUPLING | 1 | SET | 202 | China | Kolkata Sea | TATA STEEL LIMITED |
3/18/2016 | 84832000 | PEDESTAL OF PCOG BLOWER 3L31WDA SRU BPP - 1 SET --BEARING HOUSING INCORPORATING BEARING | 1 | SET | 161.6 | China | Kolkata Sea | TATA STEEL LIMITED |
3/18/2016 | 84832000 | PEDESTAL OF AIR BLOWER 3L62WDA SRU BPP - 1 SET --BEARING HOUSING INCORPORATING BEARING | 1 | SET | 575.7 | China | Kolkata Sea | TATA STEEL LIMITED |
3/8/2016 | 84836090 | FRONT DRIVE SHAFT ( 1 PCS @$ 57.87) (PARTS OF HE.M.M.) | 4.5 | KGS | 8.56 | China | Kolkata Sea | KUMAR ENGINEERS |
3/8/2016 | 84836090 | DRIVE SHAFT ( 1 PCS @$ 50.90) (PARTS OF HE.M.M.) | 3.9 | KGS | 52.08 | China | Kolkata Sea | KUMAR ENGINEERS |
3/8/2016 | 84836090 | INTERMEDIATE POPULAR SHAFT ( 1 PCS @$ 58.72) (PARTS OF HE.M.M.) | 4.5 | KGS | 60.08 | China | Kolkata Sea | KUMAR ENGINEERS |
3/10/2016 | 84835090 | FLAT KEY 8*7*20 (SPARE PARTS OF WEEDER) (10 PCS) | 0.8 | KGS | 1.35 | China | Kolkata Sea | BTL EPC LIMITED |
3/10/2016 | 84835090 | MAIN SHAFT GLAND MODEL : SR1Z-135 (SPARE PARTS OF WEEDER) 10PCS | 2.65 | KGS | 12.45 | China | Kolkata Sea | BTL EPC LIMITED |