| 1/23/2024 | 73041990 | PIPE OF 20A*20M HELIUM LINE (SPARE PARTS FOR LABORATORY EQUIPMENTS)(SAMPLE)(QTY-1PCS) (VALUE FOR CUSTOMS PURPOSE ONLY) USD | XXXXXXXXXX | 12.4 | KGS | 85.81 | CHINA | KOLKATA AIR |
| 12/30/2023 | 73041990 | SEAMLESS PIPE 94mm OD xWT17 mm MAT AISI 4130 50PCS, (TO BE USED IN MANUFACTURE OF OIL REFINERY PART) 73 | XXXXXXXXXX | 1590 | KGS | 2809.05 | CHINA | DELHI ACC |
| 11/20/2023 | 73041990 | HATE300755P0001 SEALING PIPE 164 | XXXXXXXXXX | 30 | NOS | 577.19 | CHINA | SAHAR AIR CARGO ACC |
| 11/13/2023 | 73041990 | W-5TP-69 STUD WITH BUSH | XXXXXXXXXX | 750 | PCS | 71.27 | CHINA | BANGALORE ACC |
| 11/13/2023 | 73041990 | W-5TP-69 PIPE 153.5MM | XXXXXXXXXX | 750 | PCS | 74.3 | CHINA | BANGALORE ACC |
| 10/11/2023 | 73041990 | STUDS WITH HEAT SHRINK SLEEVE TPE-69/ABS MATERIAL | XXXXXXXXXX | 3000 | PCS | 325.9 | CHINA | BANGALORE ACC |
| 10/11/2023 | 73041990 | TPE-69 PIPES,67.5,153 AND 167 MM+-5 MM TOL | XXXXXXXXXX | 3000 | NOS | 322.51 | CHINA | BANGALORE ACC |
| 8/17/2023 | 73041990 | SEAMLESS PIPE.SCHEDULE-140.SIZE-OD X THK (355.6 X 31.75M)(TOTAL UOM -150M) (SUPPLY OF IBR PIPES FOR 250 TPH BOILER PROJE | XXXXXXXXXX | 38040 | KGS | 116871.16 | CHINA | KOLKATA SEA |
| 8/17/2023 | 73041990 | PIPE | XXXXXXXXXX | 2 | PCS | 80.72 | CHINA | SAHAR AIR CARGO ACC |
| 8/17/2023 | 73041990 | SEAMLESS PIPE.SCHEDULE-100.SIZE-OD X THK (219.1 X 15.09M(TOTAL UOM -3 M) (SUPPLY OF IBR PIPES FOR 250 TPH BOILER PROJECT | XXXXXXXXXX | 227.76 | KGS | 692.35 | CHINA | KOLKATA SEA |