3/13/2024 | 90189090 | RELIEF GOODS DONATION THROUGH UNICEF
(MIDWIFERY KIT 3-RENEWABLE )
DETAL AS PER INVOICE/PACKING LIST.
EXP: 10/2026. | XXXXXXXXXX | 12 | u | 3826.032258 | Denmark | KPPI |
3/13/2024 | 90189090 | RELIEF GOODS DONATION THROUGH UNICEF
(IEHK2017 KIT SUPPL.3-RENEWABLE)
DETAL AS PER INVOICE/PACKING LIST.
EXP: 08/2025. | XXXXXXXXXX | 12 | u | 13277.412186 | Denmark | KPPI |
3/12/2024 | 30049099 | MEDICINES PED-SAM 2022 MODULE 2 ORAL MEDICINES PED-SAM 2022 MODULE 3 INJECTION MEDICINES PED-SAM 2022 MODULE 6 RENEWABLE (EMPTY CONTAINERS PROPERTY OF SHIPPING LINE AND AFTER DESTUFFING CONTAINERS MUST BE RETURN BACK). | XXXXXXXXXX | 87662 | KG | 870974.050179 | China | ITTK |
2/14/2024 | 85437090 | (5TH AND FINAL LOT OF SUPPLY OF RENEWABLE ENERGY POWER GENERATION PLANT 2.6 MWP) 3/SETS SINGLE AXIS TRACKER WITH STRUCTURE MAKE: HD SOLAR | XXXXXXXXXX | 3 | u | 19242.05 | China | KAPS |
2/12/2024 | 30049099 | RENEWABLE DRESSING MATERIAL BURNS. | XXXXXXXXXX | 2861 | KG | 31531.27 | Netherland | ITTK |
2/12/2024 | 90189090 | (3X40 REF) RENEWABLE INJECTION MATERIAL (EMPTY CONTAINER PROPERTY OF SHIPPING LINE AND AFTER DESTUFFING CONTAINER MUST BE RETURN BACK). | XXXXXXXXXX | 304 | u | 48153.16 | Netherland | ITTK |
2/12/2024 | 90189090 | RENEWABLE URINS DRAINAGE MATERIAL. | XXXXXXXXXX | 104 | u | 6908.22 | Netherland | ITTK |
2/12/2024 | 90189090 | RENEWABLE SURGICAL MISCELLANEOUS MATERIAL. | XXXXXXXXXX | 20 | u | 15226.7 | Netherland | ITTK |
2/7/2024 | 85042100 | 132KV METERING CURRENT TRANSFORMER LVB-145W3 FOR RENEWABLE ENERGY SOURCES ( 32MW BAGAASE BASED CO-GENERATION POWER PLANT )FUTHER DETAIL AS PER ATTACH DOCUMENTS | XXXXXXXXXX | 12 | u | 67447.13 | China | KAPW |
2/7/2024 | 85042100 | 132KV METERING VOLTAGE TRANSFORMER JDCF-145W3 FOR RENEWABLE ENERGY SOURCES ( 32MW BAGAASE BASED CO-GENERATION POWER PLANT ) | XXXXXXXXXX | 12 | u | 63768.19 | China | KAPW |