| 3/28/2024 | 85389000 | SUPPLY,INSTALLATION,TESTING AND COMMISSIONING OF HIGH QUALITY 15 METER HDMI CABLE | XXXXXXXXXX | 6 | NOS | 243.89 | NEPAL | SONAULI LCS |
| 3/13/2024 | 85389000 | CLOSING COIL 110 VDC, ABB INDIA SUPPLY OF VACUUM CIRCUIT BREAKERS ALONGWITH WITHSPARES FOR DESIGN, SUPPLY, ERECTION, IN | XXXXXXXXXX | 1 | PCS | 116.45 | BANGLADESH | JNPT NHAVA SHEVA SEA |
| 3/13/2024 | 85389000 | TRIPPING COIL 110 VDC, ABB INDIA SUPPLYOF VACUUM CIRCUIT BREAKERS ALONGWITH WITH SPARES FOR DESIGN, SUPPLY, ERECTION, I | XXXXXXXXXX | 1 | PCS | 116.45 | BANGLADESH | JNPT NHAVA SHEVA SEA |
| 3/12/2024 | 85389000 | 225 KV GIS SYSTEM BAYS- DG GOODS -02 (GIS BAYS ALONG WITH ACCESSORIES - LOT 2) SUPPLY, SUPERVISION OF ERECTION & COMMISS | XXXXXXXXXX | 1 | PCS | 4275.56 | SENEGAL | CHENNAI AIR |
| 3/8/2024 | 85389000 | ELECTRICAL SPARES - START - UP AND COMMISSIONING (SXB7185) | XXXXXXXXXX | 1 | SET | 449.36 | OMAN | CHENNAI AIR |
| 2/27/2024 | 85389000 | DESIGN SUPPLY COMMISSIONING OF BUS DUCT5300A690 V 2 PARTS=4 SETS | BUS DUCT 2500A660V 2 PARTS=2 SETS WITH ALL ACCESSO | XXXXXXXXXX | 6 | SET | 120388.79 | Somalia | CHENNAI SEA |
| 2/23/2024 | 85389000 | 1 YEAR OPS. & COMMISSIONING SPARES-SPAREPARTS CONSIST OF: ESBEE GE NEXT PROLEDRED & YELLOW 5 EACH | XXXXXXXXXX | 1 | SET | 1189.87 | UNITED ARAB EMIRATES | CHENNAI AIR |
| 1/24/2024 | 85389000 | SUPPLY OF LV SPARES - COMMISSIONING SPARES FOR MDB-2NOS | XXXXXXXXXX | 1 | NOS | 584.67 | NIGERIA | CHENNAI AIR |
| 1/24/2024 | 85389000 | SUPPLY OF LV SPARES - COMMISSIONING SPARES FOR MDB-1NOS | XXXXXXXXXX | 1 | NOS | 584.67 | NIGERIA | CHENNAI AIR |
| 1/23/2024 | 85389000 | ELECTRICAL SPARES - SPARES FOR COMMISSIONING & STARTUP(MXB0508)SET | XXXXXXXXXX | 1 | SET | 434.05 | OMAN | CHENNAI AIR |